Sherfield Road, Bramley, Hampshire | ||
01 September — 01 September | ||
Delays possible Traffic control (Stop/Go boards) | ||
Works location: Bramley Lc = From Lc For 200metres Either Side On Sherfield Road | ||
Works description: Annual Barrier Maintenance On The Lc. 00:01 – 06:01 On T 01/09/2012 | ||
Responsibility for works: Network Rail Infrastructure Ltd | ||
Current status: Advanced planning |
Leave a Reply