The Street, Bramley, Hampshire |
04 December — 05 December |
Delays possible |
Works location: Chytodn, The Street, Bramley, Tadley, Hampshire, Rg26 5bp |
Works description: * Renew Rebuild Sluce Valve Pits In Tarmac Carrageway |
Responsibility for works: South East Water |
Current status: Advanced planning |
Kirby Drive, Bramley, Hampshire |
04 December — 17 December |
Delays unlikely |
Works location: (Pcp4) Bduk. Opposite 1 To Side 2 Kirby Drive. |
Works description: Install 5m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Verge,Provide 1 Cabinet And Base (Nga Cabinets) |
Responsibility for works: BT |
Current status: Advanced planning |
To find out more about me, have a look at http://chris-wright.me/
Leave a Reply